Circuit Protection Fuse UL Thru Hole Slow 250V 60mA Round Body Radial Long Lead
Features
- Series: TMR
- Fuse type: Electronic Micro Fuses
- Fuse Size/Group: Cylindrical
- Response Time: Slow
- Current Rating: 0.06 A
- Voltage Rating: 250 VAC,
- Interrupt Rating AC: 50 A
- Agency Approvals: cULus; UL 248
- Major Safety Standards (UL vs IEC): UL/CSA
- IP Rating: N/A
- Size (LxWxH): 0.33 x 0.33 x 1.07 inches
- Harmonized Code: 8536.10.0040
- RoHS Status: RoHS Compliant
- Reach Status: Reach Unaffected
- CA Prop 65 Status: CA Prop 65 Compliant
Overview
Circuit Protection Fuse UL Thru Hole Slow 250V 60mA Round Body Radial Long Lead.
Product Identification
Product Type:Electronic Micro Fuses
Manufacturer Series:TMR
Compliance
Agency Approvals: UL 248, culus
Dimensions & Appearance
Length:0.33 in.
Width:0.33 in.
Height:1.07 in.
Packaging
Packaging:Bulk
Features
Blow characteristic:Slow
Current Rating:0.06 A
Fuse Type:Cylindrical
IP Rating:N/A
Voltage Rating:250 VAC