Circuit Protection Fuse UL Thru Hole Slow 250V 125mA Round Body Radial Long Lead

Features

  • Series: TMR
  • Fuse type: Electronic Micro Fuses
  • Fuse Size/Group: Cylindrical
  • Response Time: Slow
  • Current Rating: 0.125 A
  • Voltage Rating: 250 VAC,
  • Interrupt Rating AC: 50 A
  • Agency Approvals: cULus; UL 248
  • Major Safety Standards (UL vs IEC): UL/CSA
  • IP Rating: N/A
  • Size (LxWxH): 0.33 x 0.33 x 1.07 inches
  • Harmonized Code: 8536.10.0040
  • RoHS Status: RoHS Compliant
  • Reach Status: Reach Unaffected
  • CA Prop 65 Status: CA Prop 65 Compliant

Overview

Circuit Protection Fuse UL Thru Hole Slow 250V 125mA Round Body Radial Long Lead.

Product Identification

Product Type:Electronic Micro Fuses
Manufacturer Series:TMR

Compliance

Agency Approvals: UL 248, culus

Dimensions & Appearance

Length:0.33 in.
Width:0.33 in.
Height:1.07 in.

Packaging

Packaging:Bulk

Features

Blow characteristic:Slow
Current Rating:0.125 A
Fuse Type:Cylindrical
IP Rating:N/A
Voltage Rating:250 VAC
,