Circuit Protection Fuse UL Thru Hole Fast 250V 200mA Round Body Radial Long Lead
Features
- Series: FMR
- Fuse type: Electronic Micro Fuses
- Fuse Size/Group: Cylindrical
- Response Time: Fast
- Current Rating: 0.2 A
- Voltage Rating: 250 VAC,
- Interrupt Rating AC: 50 A
- Agency Approvals: cULus; UL 248
- Major Safety Standards (UL vs IEC): UL/CSA
- IP Rating: N/A
- Size (LxWxH): 0.33 x 0.33 x 1.07 inches
- Harmonized Code: 8536.10.0040
- RoHS Status: RoHS Compliant
- Reach Status: Reach Unaffected
- CA Prop 65 Status: CA Prop 65 Compliant
Overview
Circuit Protection Fuse UL Thru Hole Fast 250V 200mA Round Body Radial Long Lead.