Circuit Protection Fuse IEC Thru Hole Slow 300V 800mA Radial Long Lead for Ballast Protection

Features

  • Series: TMR-BP
  • Fuse type: Electronic Micro Fuses
  • Fuse Size/Group: Cylindrical
  • Response Time: Slow
  • Current Rating: 0.8 A
  • Voltage Rating: 300 VAC,
  • Interrupt Rating AC: 50 A
  • Agency Approvals: IEC 60127
  • Major Safety Standards (UL vs IEC): IEC
  • IP Rating: N/A
  • Size (LxWxH): 0.33 x 0.33 x 1.04 inches
  • Harmonized Code: 8536.10.0040
  • RoHS Status: RoHS Compliant
  • Reach Status: Reach Unaffected
  • CA Prop 65 Status: CA Prop 65 Compliant

Overview

Circuit Protection Fuse IEC Thru Hole Slow 300V 800mA Radial Long Lead for Ballast Protection.

Product Identification

Product Type:Electronic Micro Fuses
Manufacturer Series:TMR-BP

Compliance

Agency Approvals:IEC 60127

Dimensions & Appearance

Length:0.33 in.
Width:0.33 in.
Height:1.04 in.

Packaging

Packaging:Bulk

Features

Blow characteristic:Slow
Fuse Type:Cylindrical
IP Rating:N/A
Current Rating:0.8 A
Voltage Rating:300 VAC
,