Circuit Protection Fuse IEC Thru Hole Slow 300V 125mA Radial Long Lead for Ballast Protection
Features
- Series: TMR-BP
- Fuse type: Electronic Micro Fuses
- Fuse Size/Group: Cylindrical
- Response Time: Slow
- Current Rating: 0.125 A
- Voltage Rating: 300 VAC,
- Interrupt Rating AC: 50 A
- Agency Approvals: IEC 60127
- Major Safety Standards (UL vs IEC): IEC
- IP Rating: N/A
- Size (LxWxH): 0.33 x 0.33 x 1.04 inches
- Harmonized Code: 8536.10.0040
- RoHS Status: RoHS Compliant
- Reach Status: Reach Unaffected
- CA Prop 65 Status: CA Prop 65 Compliant
Overview
Circuit Protection Fuse IEC Thru Hole Slow 300V 125mA Radial Long Lead for Ballast Protection.
Product Identification
Product Type:Electronic Micro Fuses
Manufacturer Series:TMR-BP
Compliance
Agency Approvals:IEC 60127
Dimensions & Appearance
Length:0.33 in.
Width:0.33 in.
Height:1.04 in.
Packaging
Packaging:Bulk
Features
Blow characteristic:Slow
Current Rating:0.125 A
Fuse Type:Cylindrical
IP Rating:N/A
Voltage Rating:300 VAC